SANJIESAN SPACE / Screen and cinema-room planning
Keep projector throw distance distinct from the room length
A room length and a projector’s relevant distance can look like the same line on a rough sketch. Define the endpoints so the plan does not use one number to answer two different questions.
Use the manufacturer’s definition as the starting point
Epson’s guide describes throw distance as the distance between the projector and the image on the screen. Keep that definition beside the room sketch rather than substituting wall-to-wall length. For an exact candidate, use its own reference points and documentation; the general explanation does not establish a specific model’s placement. This is a planning enquiry, not mounting or electrical instructions. Do not look into a projector beam or physically reposition equipment to test a paper assumption. The drawing can remain provisional while the relevant information is obtained.
Draw three things separately
On the same scaled plan, identify the room boundary, the proposed image plane and the actual or assumed projector enclosure. Label every unconfirmed position as proposed. Do not place the device’s rear edge on a wall line and silently treat that as the documented distance reference. Keep any candidate-specific ventilation, support and other installation requirements with the proper source. The useful sketch shows what the number measures and which placement questions remain open, instead of presenting a single long arrow as a complete setup specification.
Ask the exact-model question before choosing a size
Take the labelled sketch to the exact product documentation or an appropriate source. Ask which image sizes and placements it actually supports under the relevant stated conditions. Keep any calculator output labelled as a calculation with its inputs, not as a measurement of the room or a completed installation check. Do not infer suitability from a broad short-throw category alone. A credible brief connects the desired image, the room boundary and the candidate’s documented requirements, with a reason to pause if an essential part cannot be answered.